How long does it take to build a website?

Short answer

A landing page takes 1 to 2 weeks, a business website 2 to 4 weeks and an online store 4 to 6 weeks. The real timeline depends less on the design than on how fast the client delivers copy, photos and answers to each round of revisions: that is the bottleneck in most projects that run late.

Would you rather have it answered for your specific case?

Ask me on WhatsApp

The timelines I’m about to give you are the ones I commit to, not the ones that look good in a proposal. Then I’ll tell you what actually makes a project drag on, because it’s almost never what people think.

Timelines by type of website

TypeTimelineRevisions
Landing page1–2 weeks2 rounds
Business website2–4 weeks3 rounds
Online store4–6 weeks3 rounds

The clock starts when I have your material, not when we sign.

Where the time actually goes

Here’s the interesting part, because people assume almost all the time goes into design. It doesn’t. On a three-week business website, the breakdown looks roughly like this:

Days 1–2 · Understanding your business. What you sell, to whom, what sets you apart, and what you want a visitor to do. This part looks like the least productive one, and it’s the one that most determines the result. A good-looking website that doesn’t know who it’s talking to doesn’t sell.

Days 3–5 · Structure and copy. Which pages there are, what each one says and in what order. This gets decided before anything is designed, because designing on top of content that doesn’t exist yet is the recipe for having to redo it.

Days 6–11 · Design and development. This is where you see visible progress. I show you the first version halfway through, not at the end.

Days 12–16 · Revisions. You look, you point things out, we adjust.

Days 17–19 · Testing and launch. A real phone, speed, forms, Search Console, Analytics. Nothing goes live without being tested on an actual phone.

Notice something: design and development are less than half the time. The rest is deciding well and checking that it works.

What really delays a project

On a web project, delays almost never come from the design. They come from here, in this order:

1. The copy (number one, by a wide margin)

“I’ll send you the copy this week” is the sentence that most easily turns into three weeks. It’s not bad faith: writing about your own business is surprisingly hard, and there’s always something more urgent to do.

How I solve it: I don’t ask you for “the copy.” I ask you specific questions over WhatsApp, and from your answers I write the copy for the website myself, included in the price. Answering five questions by voice message is much easier than facing a blank document.

2. The photos

The second bottleneck. People put off the photos because they think they need a professional photo shoot.

How I solve it: I tell you exactly which photos to take with your cell phone, in what light and from what angle. That’s enough to start, and you hire the professional photographer later, when the business calls for it.

3. Decisions with several partners

If three people have to approve the website, each round of revisions takes three times as long. Not because they argue, but because coordinating three schedules is slow.

How I solve it: I ask that one person be named the final voice. Everyone else gives their opinion, but one person decides. That alone saves weeks.

4. Deciding things that could have been decided earlier

One example: halfway through the design, the question comes up of whether the website is going to be bilingual. That decision changes the structure, so making it halfway through means redoing work.

How I solve it: every question that affects the structure gets asked at the start, even if it’s uncomfortable.

Want a specific date for your project?

Ask for one

What you can do to make it go fast

If you want your website on the short end of the range instead of the long one, this is what actually gets it there:

  • Reply the same day. It’s the number one factor: if you answer fast, your website can be ready ahead of schedule.
  • Gather the photos before we start, even if they’re from your phone. Ten decent photos are worth more than the promise of a professional shoot next month.
  • Be clear about the one action you want a visitor to take: call, book, or send a message. Just one. If you aren’t clear on it, the website can’t be clear either.
  • Put all your corrections in a single batch. Five messages with one correction each cost more time than one message with five.
  • Name one person who decides.

Can it be done faster?

Yes, with conditions. A landing page can be live in 3 or 4 days if three things line up: you have the copy, you have the photos, and you’re available to review each version the same day I send it.

What I don’t accept are rush jobs that force us to skip testing. If you launch a website without testing the forms on a real phone, you can find out three weeks later that not a single message ever reached you. Testing doesn’t get cut.

What if you take longer than you said?

I’ll let you know before you have to ask me. It sounds obvious, but if you’ve ever worked with someone who vanished in the middle of a project, you know it isn’t.

If the delay is mine, I tell you and give you a new date. If the delay comes from material of yours that’s missing, I tell you that too, no blame but no ambiguity, because if you don’t know the project is sitting there waiting on you, you can’t get it moving again.

In short

The timeline isn’t set by technical complexity. It’s set by how fast the answers come. A project where the client replies the same day can be done in half the time of an identical one where replies take a week.

If you want to know the timeline for your case, write to me and tell me what you need, and I’ll give you a specific date in writing, along with the quote. No commitment.